03-24-2017, 10:56 AM
kollnjak napisał(a):Hi,
it would be can be upgraded to the event ??
1) A mathematical function
How do you see the operation of these mathematical functions? Explain more
kollnjak napisał(a):2) "The final event" could be used in other logic(event) (it would solve the problem with missing diff temperatures)We'll think about it, but diff will be add soon (week)
kollnjak napisał(a):3) EVNT(time by scheduler) could specify interval (start, stop)You can set the start and stop times of the EVENT in the scheduler
pozdrawiam
tomek
tomek