Liczba postów: 64
Liczba wątków: 16
Dołączył: Feb 2017
Reputacja:
0
Hello,
possible event upgrades:
time delay on / off in logic functions
eg (ind1 = 1) and (ind2 = 1 + 10minut) = out1 = 1
stats page:
1) visibility of virtual outputs
2) the ability to control virtual outputs?
thanks for your work
<t></t>
Liczba postów: 64
Liczba wątków: 16
Dołączył: Feb 2017
Reputacja:
0
1) turn on the output with a late turn in the input, I will not receive anything that would have to be explained and defended ... right?
2) I would need a virtual drive to run before I see it (but it is related). I have already restarted LK3 several times since it was stuck, and since the virtual outputs are temporarily switched on, and the restart was done in the middle of the interval, I did not have to influence this unpleasant thing ... so I had to add unnecessarily once a time event that I deleted after timeout (not to mention that LK3 drive when entering new events in the scheduler again stuck !!!) so add virtual output at least to page control / ouput would save me a lot of nerves and prolong my life ..
<t></t>